> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# RCW 70A.310.040 — Facility operations and decommissioning — Monitoring.

- **Citation**: RCW 70A.310.040
- **Node Type**: section
- **Jurisdiction**: Washington (state)
- **Code Body**: Revised Code of Washington (RCW)
- **Official Source**: [https://app.leg.wa.gov/RCW/default.aspx?cite=70A.310&full=true](https://app.leg.wa.gov/RCW/default.aspx?cite=70A.310&full=true)
- **Canonical URL**: [https://corpuslaw.us/codes/washington/title-70a/chapter-70a-310/section-70a-310-040](https://corpuslaw.us/codes/washington/title-70a/chapter-70a-310/section-70a-310-040)
- **Semantic URL**: [https://corpuslaw.us/codes/washington/title-70a/chapter-70a-310/section-70a-310-040](https://corpuslaw.us/codes/washington/title-70a/chapter-70a-310/section-70a-310-040)

## Hierarchy

Title 70A — ENVIRONMENTAL HEALTH AND SAFETY > Chapter 70A.310 — MILL TAILINGS — LICENSING AND PERPETUAL CARE

## Text

The secretary or his or her representative shall monitor the operations of the mill for compliance with the conditions of the license by the owner or operator. The mill owner or operator shall be responsible for compliance, both during the lifetime of the facility and at shutdown, including but not limited to such requirements as fencing and posting the site; contouring, covering, and stabilizing the pile; and for decommissioning the facility.

The secretary or his or her representative shall monitor the operations of the mill for compliance with the conditions of the license by the owner or operator. The mill owner or operator shall be responsible for compliance, both during the lifetime of the facility and at shutdown, including but not limited to such requirements as fencing and posting the site; contouring, covering, and stabilizing the pile; and for decommissioning the facility.
