> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Wyo. Stat. Ann. § 41-3-934 — Time limits to complete construction; extensions; cancellation generally.

- **Citation**: Wyo. Stat. Ann. § 41-3-934
- **Node Type**: section
- **Jurisdiction**: Wyoming (state)
- **Code Body**: Wyoming Statutes Annotated (WSA)
- **Official Source**: [https://wyoleg.gov/statutes/compress/title41.pdf](https://wyoleg.gov/statutes/compress/title41.pdf)
- **Canonical URL**: [https://corpuslaw.us/codes/wyoming/title-41/chapter-3/section-41-3-934](https://corpuslaw.us/codes/wyoming/title-41/chapter-3/section-41-3-934)
- **Semantic URL**: [https://corpuslaw.us/codes/wyoming/title-41/chapter-3/section-41-3-934](https://corpuslaw.us/codes/wyoming/title-41/chapter-3/section-41-3-934)

## Hierarchy

Title 41 — Water > Chapter 3 — Water Rights; Administration and Control

## Text

If the permit is granted, the applicant shall complete the construction and apply the water to beneficial use before the date specified in the conditions of approval, which shall not be more than three (3) years after the date of approval. The state engineer may extend the period or cancel the permit in accordance with the procedures set forth in W.S. 41-4-506.
