Improvements not causally connected to conservation measure
Ind. Code § 36-1-12.5-12
in effectSec. 12. An improvement that is not causally connected to a conservation measure may be included in a guaranteed savings contract if:
(1) the total value of the improvement does not exceed fifteen percent (15%) of the total value of the guaranteed savings contract; and
(2) either:
(A) the improvement is necessary to conform to a law, a rule, or an ordinance; or
(B) an analysis within the guaranteed savings contract demonstrates that:
(i) there is an economic advantage to the political subdivision in implementing an improvement as part of the guaranteed savings contract; and
(ii) the savings justification for the improvement is documented by industry engineering standards.
As added by P.L.98-2002, SEC.9. Amended by P.L.1-2006, SEC.557; P.L.168-2006, SEC.20; P.L.109-2015, SEC.58; P.L.233-2015, SEC.332; P.L.157-2026, SEC.228.