225 ILCS 720

225 ILCS 720
in effect

225 ILCS 720/1.01 Short Title

225 ILCS 720/1.02 Legislative Declaration

225 ILCS 720/1.03 Definitions

225 ILCS 720/1.04 (Repealed)

225 ILCS 720/1.05 Interagency Committee

225 ILCS 720/1.06 Scope of the Act

225 ILCS 720/1.07 Construction

225 ILCS 720/2.01 Necessity of a Permit

225 ILCS 720/2.02 Contents of Permit Application

225 ILCS 720/2.03 Reclamation Plan

225 ILCS 720/2.04 Notice and Public Review of Applications

225 ILCS 720/2.05 Application Fee

225 ILCS 720/2.06 Duration of Permit

225 ILCS 720/2.07 Renewals

225 ILCS 720/2.08

225 ILCS 720/2.09 Permit Revision

225 ILCS 720/2.10 Periodic Review of Permits

225 ILCS 720/2.11 Procedures for Approval

225 ILCS 720/3.01 General Requirement

225 ILCS 720/3.02 Coal Utilization

225 ILCS 720/3.03 Land Use

225 ILCS 720/3.04 Grading

225 ILCS 720/3.05 Stabilization

225 ILCS 720/3.06 Topsoil

225 ILCS 720/3.07 Prime Farmlands and High Capability Lands

225 ILCS 720/3.08 Runoff Water

225 ILCS 720/3.09 Augering

225 ILCS 720/3.10 Hydrology

225 ILCS 720/3.11 Wastes

225 ILCS 720/3.12 Nearby Mines

225 ILCS 720/3.13 Explosives

225 ILCS 720/3.14 Roads and Ditches

225 ILCS 720/3.15 Vegetation

225 ILCS 720/3.16 Offsite Areas

225 ILCS 720/3.17 Excess Spoil

225 ILCS 720/3.18 Fish, Wildlife, and Related Environmental Values

225 ILCS 720/3.19 Natural Barriers

225 ILCS 720/3.20 Illinois Environmental Protection Act

225 ILCS 720/3.21 Signs

225 ILCS 720/3.22 Other Criteria

225 ILCS 720/3.23 Steep-Slope Mining

225 ILCS 720/3.24 Water Rights

225 ILCS 720/3.25 Timing of Reclamation

225 ILCS 720/3.26 Variances for Joint Surface and Underground Mining

225 ILCS 720/4.01 General Requirement

225 ILCS 720/4.02 Subsidence

225 ILCS 720/4.03 Sealing Openings

225 ILCS 720/4.04 Exploratory Holes

225 ILCS 720/4.05 Wastes

225 ILCS 720/4.06 Vegetation

225 ILCS 720/4.07 Offsite Areas

225 ILCS 720/4.08 Hazards

225 ILCS 720/4.09 Hydrology

225 ILCS 720/4.10 Suspension of Operations in Urbanized Areas

225 ILCS 720/4.11 Other Impacts

225 ILCS 720/5.01 Exploration Rules

225 ILCS 720/5.02 Notice

225 ILCS 720/5.03 Approval

225 ILCS 720/5.04 Performance Standards

225 ILCS 720/5.05 Confidential Information

225 ILCS 720/5.06 Penalties

225 ILCS 720/6.01 Requirement of a Bond

225 ILCS 720/6.02 Amount of Bond

225 ILCS 720/6.03 Duration of Bond

225 ILCS 720/6.04 Cancellation

225 ILCS 720/6.05 Alternatives to a Bond

225 ILCS 720/6.06 Changes in Amount of Bond

225 ILCS 720/6.07 Forfeiture

225 ILCS 720/6.08

225 ILCS 720/7.01 Prohibited Mining

225 ILCS 720/7.02 Criteria for Designating Lands Unsuitable for Mining Operations

225 ILCS 720/7.03

225 ILCS 720/7.04 Land Report

225 ILCS 720/7.05 Construction

225 ILCS 720/8.01 Inspection

225 ILCS 720/8.02 Records

225 ILCS 720/8.03 Violation Reports

225 ILCS 720/8.04 Civil and Criminal Penalties

225 ILCS 720/8.05 Civil Actions

225 ILCS 720/8.06 Enforcement Procedures

225 ILCS 720/8.07 Administrative Review

225 ILCS 720/8.08 Judicial Relief

225 ILCS 720/8.09 Hearings

225 ILCS 720/8.10 Review under Administrative Review Law

225 ILCS 720/9.01 Rules

225 ILCS 720/9.02 General Duties and Powers

225 ILCS 720/9.03

225 ILCS 720/9.04

225 ILCS 720/9.05

225 ILCS 720/9.06 Financial Interest

225 ILCS 720/9.07 Fees and Forfeitures

225 ILCS 720/9.08 Transition

225 ILCS 720/9.09

Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.ilga.gov/legislation/ilcs/ilcs.aspFetched: 10/17/2026