Study of compliance problem of small electric utility systems
42 U.S.C. § 8454
in effect(a) StudyThe Secretary shall conduct a study of the problems of compliance with this chapter experienced by those electric utility systems which have a total system generating capacity of less than 2,000 megawatts. The Secretary shall report his findings and his recommendations to the Congress not later than 2 years after the effective date of this chapter.
(b) Authorization of appropriationsThere is authorized to be appropriated to the Secretary for the fiscal year 1979 not to exceed $500,000 to carry out the provisions of this section.
Source: OLRC USLMURL: https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc42@119-95.zipFetched: 6/7/2026
