MISCELLANEOUS PROJECTS

RCW 47.20
in effect

RCW 47.20.570 Manette bridge authorized.

RCW 47.20.580 Washington State University highway authorized.

RCW 47.20.590 University of Washington approach authorized.

RCW 47.20.600 Washington State University highway, University of Washington approach — Acquisition of property.

RCW 47.20.605 Washington State University highway, University of Washington approach — Public use.

RCW 47.20.610 Washington State University highway, University of Washington approach — Condemnation.

RCW 47.20.620 Washington State University highway, University of Washington approach — Measure of damage to buildings.

RCW 47.20.630 Washington State University highway, University of Washington approach — Sale of buildings, personalty, acquired in acquisition of land.

RCW 47.20.635 University of Washington approach — Ordinance requisite — Construction and maintenance.

RCW 47.20.640 Reestablishment and redesignation of intersections when highway relocated.

RCW 47.20.645 Interstate 90 corridor — Legislative finding.

RCW 47.20.647 Interstate 90 corridor — Withdrawal of local governments from project — Effect on use of state funds.

RCW 47.20.653 Interstate 90 corridor — Court proceedings, priority.

RCW 47.20.700 State route No. 504 (Spirit Lake Memorial Highway) — Extension and parking facilities.

RCW 47.20.710 Quinault Tribal Highway — Agreement authorized — Route.

RCW 47.20.715 Quinault Tribal Highway — Maintenance, operation, improvements — Intersections, access.

RCW 47.20.720 Quinault Tribal Highway — Certain portion as limited access.

RCW 47.20.725 Quinault Tribal Highway — Acquisition of remaining right-of-way.

RCW 47.20.730 Quinault Tribal Highway — Department as agent.

RCW 47.20.735 Quinault Tribal Highway — Authority to seek federal funding.

RCW 47.20.740 Lummi Nation public road — Agreement authorized — Route.

RCW 47.20.743 Lummi Nation roadway — Department may proceed with design and construction.

RCW 47.20.746 Lummi Nation roadway — Temporary easement — Governing authority of Lummi Nation.

RCW 47.20.780 Design-build, progressive design-build, general contractor/construction manager procedures — Competitive bidding.

RCW 47.20.785 Design-build, progressive design-build, and general contractor/construction manager procedures — Public works projects.

RCW 47.20.900 Severability — 1975 1st ex.s. c 272.

Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=47.20&full=trueFetched: 6/29/2026