65 ILCS 5/11-135.5-65
65 ILCS 5/11-135.5-65
in effect(65 ILCS 5/11-135.5-65) Sec. 11-135.5-65. Small projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the commission may combine the two-phase procedure for selection described in Section 11-135.5-60 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 11-135.5-60. (Source: P.A. 102-1134, eff. 2-10-23.)
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.ilga.gov/legislation/ilcs/ilcs.aspFetched: 10/17/2026
