Determination as to whether construction is a hydraulic project — Preapplication determination — Review and comment period — Written determination.

RCW 77.55.400
in effect
Sign in to generate a plain English summaryAsk Belisarius Agent
Source: WA Statutes (Official Site)URL: https://app.leg.wa.gov/RCW/default.aspx?cite=77.55&full=trueFetched: 6/29/2026