Submission of plans to state engineer - not required
C.R.S. § 37-43-209
in effect37-43-209. Submission of plans to state engineer - not required. (1) Notwithstanding the provisions of section 37-41-104 (1), a contracting district shall not be required to submit to the state engineer:
(a) Plans for the construction, operation, or maintenance of salinity control laterals; or
(b) Information concerning such salinity control laterals.
(2) Notwithstanding the provisions of section 37-41-104 (1), a contracting district shall not be required to obtain a decision from the state engineer as to the feasibility of construction, operation, and maintenance of salinity control laterals.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://leg.colorado.gov/sites/default/files/images/olls/crs2024-title-37.docx#37-43-209Fetched: 10/6/2026
