Ownership of drawings, specifications, and information
Ind. Code § 5-30-7-9
in effectSec. 9. (a) Unless and until a proposal is accepted, the drawings, specifications, and other information in the proposal are the property of the offeror.
(b) After a proposal is accepted, ownership of the drawings, specifications, and information in the drawings and specifications shall be determined under Indiana law and the terms of the design-build contract.
As added by P.L.74-2005, SEC.1.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://iga.in.gov/laws/2026/ic/titles/5Fetched: 10/17/2026
