Vertical expansions of existing permitted landfill; submission of design, engineering, and operational requirements
Ind. Code § 13-19-3-6
in effectSec. 6. Notwithstanding federal regulations, the board and the department shall adopt rules under section 1 of this chapter that require the applicant for a vertical expansion of an existing permitted landfill to submit design, engineering, and operational requirements, including the following:
(1) A more precise definition of the hydrogeology of the site, including a soil gas analysis.
(2) Operational requirements.
(3) Surface water control plan.
(4) Landfill gas control plan.
(5) Final cover requirements.
(6) Closure and financial assurance plans.
(7) Remedial action plan.
[Pre-1996 Recodification Citation: 13-1-12-9(d).]
As added by P.L.1-1996, SEC.9.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://iga.in.gov/laws/2026/ic/titles/13Fetched: 10/17/2026
