Approval required
Ind. Code § 36-1-12.5-8
in effectSec. 8. Conservation measures installed under a utility efficiency program or a guaranteed savings contract must be approved by the following:
(1) The Indiana department of health, department of homeland security, and any other state agency designated by statute.
(2) An architect or engineer licensed under IC 25-4 or IC 25-31 if the conservation measures have a cost of more than fifty thousand dollars ($50,000).
As added by P.L.24-1993, SEC.6. Amended by P.L.1-2006, SEC.555; P.L.168-2006, SEC.16; P.L.187-2021, SEC.139; P.L.56-2023, SEC.328.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://iga.in.gov/laws/2026/ic/titles/36Fetched: 10/17/2026
