Applicability.
18 C.F.R. § 4.101
in effectEffective: 2024-07-01This subpart provides procedures for exemption on a case-specific basis from all or part of Part I of the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in § 4.30(b)(31).
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-18.xmlFetched: 7/26/2026
