Reduction or withdrawal of grant.
24 C.F.R. § 1003.702
in effectEffective: 2024-07-01(a) General. A reduction or withdrawal of a grant under paragraph (b) of this section will not be made until at least one of the corrective or remedial actions specified in § 1003.701(b) has been taken and only then if the grantee has not made an appropriate and timely response. Before making such a grant reduction or withdrawal, the grantee also shall be notified and given an opportunity within a prescribed time for an informal consultation regarding the proposed action.
(b) Reduction or withdrawal. When the Area ONAP determines, on the basis of a review of the grantee's performance, that the objectives set forth in § 1003.700(a)(2) or (3) have not been met, the Area ONAP may reduce or withdraw the grant, except that funds already expended on eligible approved activities shall not be recaptured.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-24.xmlFetched: 7/26/2026
