Performance and payment bonds required when using design-build or construction manager at risk methods of project delivery.
Miss. Code Ann. § 31-5-52
in effectThe use of either the design-build method of project delivery as provided in Section 31-7-13.1 or the construction manager at risk method of project delivery as provided in Section 31-7-13.2 must comply with the provisions of Section 31-5-51.