65 ILCS 5/11-39.2-30
65 ILCS 5/11-39.2-30
in effect(65 ILCS 5/11-39.2-30) Sec. 11-39.2-30. Small projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the municipality may combine the two-phase procedure for selection described in Section 11-39.2-25 into one combined step if all the requirements of evaluation are performed in accordance with Section 11-39.2-25. (Source: P.A. 103-491, eff. 1-1-24.)
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.ilga.gov/legislation/ilcs/ilcs.aspFetched: 10/17/2026
