Notice of construction of new surface water intake required.
S.C. Code Ann. § 49-4-130
in effectA surface water withdrawer must provide the department with prior written notice of the construction of a new surface water intake that changes the method of measuring the water the permittee is withdrawing, cessation of its surface water withdrawals, a proposed change in ownership, or the abandonment of a surface water intake. Editor's Note 2010 Act No. 247, SECTION 4.B, provides: "Chapter 1, Title 49 of the 1976 Code is not affected by and supersedes Chapter 4, Title 49 of the 1976 Code, as amended by SECTION 1 of this act." Effect of Amendment The 2010 amendment rewrote the section.
Source: Open US Law by Vaquill AI (CC BY 4.0)URL: https://www.scstatehouse.gov/code/t49c004.phpFetched: 10/17/2026
