Construction approval; grease control equipment designs
Ind. Code § 8-1-46.1-18
in effectSec. 18. (a) Before construction or a major renovation of a regulated entity, the owner of the regulated entity or the owner's agent shall submit the proposed grease control equipment design to the applicable regulating authority for review before installation.
(b) Upon receiving the grease control equipment design described in subsection (a), the regulating authority shall review the proposed design and provide:
(1) a written approval;
(2) a written denial; or
(3) modification recommendations;
based on performance standards under this chapter within sixty (60) days.
(c) A regulating authority shall coordinate with the appropriate:
(1) building and zoning authority;
(2) plumbing permit authorities; or
(3) utility;
to ensure the regulated entity receives consistent direction before construction.
(d) A regulating authority that determines a regulated entity's proposed:
(1) grease control equipment design; or
(2) maintenance plan;
does not meet the performance standard shall provide a written explanation to the regulated entity.
As added by P.L.95-2026, SEC.1.