Section 7809.
Cal. Public Utilities Code - PUC § 7809.
in effectAny proposed railroad track may be permitted to cross any track already constructed, the crossing being made as provided in Chapter 1 of this division. In laying down the track and preparing therefor, not more than one block shall be obstructed at any one time, nor for a longer period than 10 working days.
Source: CA Legislative Counsel Bulk DataURL: https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zipFetched: 6/27/2026
