§ 8-04 Process Control Measures.
All records required pursuant to this section must be retained and produced in accordance with subdivision (a) of 24 RCNY § 8-07. (a) Routine system monitoring. An owner must designate a responsible person as defined in 24 RCNY § 8-02 to monitor each cooling tower system at least weekly while such system is in use. (1) The responsible person must enter on a written or electronic checklist provided and maintained by the owner all visual observations of the cooling tower system and associated equipment. (2) The responsible person must possess the skills and have the knowledge necessary to be able to monitor the system under the guidance of a qualified person, in accordance with the management program and plan. (3) All wetted surfaces visible during cooling tower operation without shutting down the system, tower basins and drift eliminators must be observed during monitoring and the presence of organic material, biofilm, algae, scale, sediment and silt/dust deposits, organics (oil and grease), and other visible contaminants observed must be noted on the checklist. (4) The responsible person must observe and note the condition of chemical dosing and control equipment and the bleed-off system, and determine if there is sufficient storage and delivery of treatment chemicals. (5) Any system anomalies or problems must be recorded on the checklist and reported to the management and maintenance team for corrective action to be completed within 24 hours. (b) Compliance inspections. An owner must retain a qualified person to conduct a compliance inspection at least once every ninety (90) days while a cooling tower system is in operation. The qualified person must complete and the owner must maintain a written or electronic checklist containing observations and findings with respect to any of the following: (1) Presence of organic material, biofilm, algae, and other visible contaminants. (2) General condition of the tower, the basin, packing material and drift eliminator. (3) Quality of water makeup connections and control. (4) Proper functioning of the conductivity control. (5) Proper functioning of all dosing equipment (pumps, strain gauges). (6) Review of routine maintenance records to ensure proper implementation of required activities and corrective actions as needed. (c) Maintenance. (1) Routine maintenance. Cooling tower systems must be maintained and operated in accordance with the maintenance program and plan. Routine maintenance must address all components and operations, including, but not limited to, general system cleanliness, drift eliminator and fill material condition, overall distribution operation, water treatment system, basin/remote sump cleaning, and purging of stagnant and low-flow zones. (2) Replacement in kind. Any replacement part or equipment used in a cooling tower must comply with the manufacturer's design and performance specifications. As applicable, replacement materials must be corrosion resistant and effectively prevent the penetration of sunlight. Any alteration or replacement of a cooling tower system must comply with the New York City Construction Codes. (d) Cleaning. The cooling tower system must be cleaned whenever routine monitoring indicates a need for cleaning, but no less than twice a year, in accordance with the maintenance program and plan. Cleaning protocol indicated by the manufacturer's instructions or industry standards, and worker protective measures, as required by applicable law must be specified in the maintenance program and plan. Water contact areas such as the basin, sump, fill, spray nozzles and fittings, drift eliminators and air intake louvres must be properly accessed or removed to facilitate cleaning. (e) Aerosol and mist control. The cooling tower system must be operated at all times to minimize the formation and release of aerosols and mist. Owners must install and maintain drift eliminators in accordance with the manufacturer's specifications and the New York City Construction Codes. The calculated drift loss at maximum design water circulation must not exceed the manufacturer's tested value for maximum drift loss. Counter-flow cooling towers must achieve a reduction of drift loss to no more than 0.002% percent of the recirculated water volume; cross-flow cooling towers must achieve a reduction of drift loss to no more than 0.005% of the recirculated water volume. (f) Summertime hyperhalogenation. (1) A cooling tower system must undergo a summertime hyperhalogenation at least once each year between July 1 and August 31 in accordance with this subdivision. The hyperhalogenation must be performed by a person qualified to apply biocide pursuant to 24 RCNY § 8-05(c)(1). The hyperhalogenation must be performed with a registered chlorine or bromine based biocide that is effective at Legionella control in accordance with 24 RCNY § 8-05(c). A cooling tower system is exempt from this subdivision if it is in full system shutdown and completely drained of water, in accordance with 24 RCNY § 8-06(a), for the entire period between July 1 and August 31. (2) Prior to the hyperhalogenation, the cooling tower system must be prepared to ensure that water flow reaches the entire cooling tower system. Biocide applied during the hyperhalogenation must reach all parts of the cooling tower system, including offline or standby equipment that may be out of service, or only used on-demand or during peak demand periods. (3) During the hyperhalogenation, a minimum of 5 ppm free halogen residual must be continuously maintained in the cooling tower system for at least six hours. Additionally, the pH and halogen residuals must be measured at two independent sampling locations within the cooling tower system during the hyperhalogenation to verify the minimum biocide residual was achieved and maintained. The water treatment program shall be reviewed by the management and maintenance team to determine if additional chemical inhibitors are desirable to prevent corrosion and scaling. (4) A Legionella culture sample must be collected in accordance with 24 RCNY § 8-05(f)(3) within 3 to 31 days after the hyperhalogenation required by paragraph (1) of this subdivision. Sample results must be interpreted, and corrective actions implemented, in accordance with the result levels indicated in Table 8-1 of this Chapter. (5) An owner must submit a declaration of summertime hyperhalogenation within 30 days of completion of the hyperhalogenation required by paragraph (1) of this subdivision through the NYC Cooling Tower Registration Portal. The declaration must include the cooling tower system ID; the hyperhalogenation protocol performed, including the name and quantity of biocides and chemicals applied; dose and contact time; effective pH range of biocides; pH and halogen residual monitoring results during hyperhalogenation; service date and name and qualifications of the person who applied the biocide. (Added City Record 4/7/2016, eff. 5/7/2016; amended City Record 7/7/2020, eff. 7/7/2020; amended City Record 4/8/2026, eff. 5/8/2026)