Examination.
Municipal Code of Chicago § 14A-6-603.4.2
in effect14A-6-603.4.2 Examination.
Tanks and support structures must be closely examined by a registered design professional within 1 year after installation and at least once every 2 years after the initial inspection. The registered design professional must prepare a signed and sealed written report on the internal and external structural condition and integrity of the tank and the external structural condition and integrity of the support structure and provide it to the owner.
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661646Fetched: 10/24/2026
