Drawings not required.
Municipal Code of Chicago § 14A-4-412.1.1
in effect14A-4-412.1.1 Drawings not required.
If Table 14A-12-1204.2 indicates or the building official determines that drawings are not required for the scope of work covered by a permit application, the permit fee indicated in Table 14A-12-1204.2 must be paid to the City at the time of permit issuance.
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661384Fetched: 10/24/2026
