Electrical inspections.
Municipal Code of Chicago § 14A-5-502.5
in effect14A-5-502.5 Electrical inspections.
The permit holder must notify the building official when electrical work done pursuant to a permit is ready for the following types of inspections:
1. Rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all electrical raceway is roughed-in, and before the installation of wall or ceiling membranes.
2. Final inspection, after all electrical fixtures are in place and properly connected and the work area is ready for occupancy.
(Amend Coun. J. 6-25-21, p. 32180, Art. I, § 10)
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661538Fetched: 10/24/2026
