For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Certificate for construction of generating facility; analysis of long-range needs for expansion of facilities; ongoing review of construction costs; inclusion of approved construction costs in rates.

G.S. 62-110.1
in effect
Sign in to generate a plain English summaryAsk Belisarius Agent
Source: North Carolina General Assembly (ncleg.gov)URL: https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_62/GS_62-110.1.htmlFetched: 10/19/2026