PERMIT REQUIRED.
Los Angeles Municipal Code § 57.4701.2
in effectSEC. 57.4701.2. PERMIT REQUIRED.
A permit is required to engage in the business of operating a place of assemblage or to temporarily use a building or part thereof or premise as a place of assemblage.
Source: City of Los Angeles, Charter and Codes (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/los_angeles/latest/lamc/0-0-0-349188Fetched: 10/24/2026
