Means of egress.
Municipal Code of Chicago § 14B-33-3310
in effect14B-33-3310 Means of egress.
The provisions of Section 3310 of IBC are adopted by reference with the following modification:
1. Add a new Section 3310.3 to read:
"3310.3 Floor required.
In buildings where construction of the superstructure precedes construction of the permanent floor, a substantial temporary floor shall be constructed at a level not more than two floors below the highest level where work is being performed."
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2668272Fetched: 10/24/2026
