General.
Municipal Code of Chicago § 14A-12-1206.1
in effect14A-12-1206.1 General.
Fees applicable to the provisions of Chapter 6 are as provided in Table 14A-12-1206.1.
Table 14A-12-1206.1 Fees – Chapter 6
Section | Description | Amount
Section | Description | Amount
14A-6-601.1.2 | Per reinspection | $100
14A-6-601.1.3 | Late payment penalty (per each 30 days past due but not to exceed 100 percent of the assessed fee) | $5
14A-6-602 | Periodic inspection - Group A occupancy |
First 25,000 square feet (or fraction thereof) | $120
Each additional 25,000 square feet (or fraction thereof) | $60
Periodic inspection - other than Group A occupancy |
First 25,000 square feet (or fraction thereof) | $80
Each additional 25,000 square feet (or fraction thereof) | $40
14A-6-603.2 | Filing fee | $75
Re-review fee for deficient report | $75
14A-6-603.3 | Filing fee | $25
Re-review fee for deficient report | $25
14A-6-603.4 | Filing fee | $75
Re-review fee for deficient report | $75
14A-6-603.5 | Filing fee | $75
Re-review fee for deficient report | $75
14A-6-604.2 | Per curtain | $100
14A-6-604.3 | Per tank (including support structure) | $150
14A-6-605 | Elevator, vertical reciprocating conveyor, or manlift |
10 stories or less a | $105
11 to 20 stories a | $125
21 to 30 stories a | $140
Over 30 stories a | $155
Escalator or moving walk | $75
Movable stage or orchestra floor | $125
Platform lift | $75
Hinged platform lift for trucks or loading docks | $45
Material lifts | $105
Platform lift or stairway lift | $50
Mechanical amusement riding device |
Coin-operated (annual permit required) | n/a
Other than coin-operated | $100
Any other conveyance device | $75
14A-6-606.2 | Per 1,000 cubic feet per minute of required supply and exhaust (minimum fee: $50) | $5
14A-6-606.3 | Per generator or compressor b |
Capacity of 3 tons or less | $50
Capacity over 3 tons and not over 30 tons | $60
Capacity over 30 tons and not over 100 tons | $70
Capacity over 100 tons and not over 1,000 tons | $80
Capacity over 1,000 tons | $100
14A-6-606.4 | Per boiler |
Capacity over 288,000 and not over 2.4 million BTU/hr | $50
Capacity over 2.4 million and not over 6 million BTU/hr | $75
Capacity over 6 million BTU/hr | $85
Per unfired pressure vessel |
Diameter under 18 inches | $45
Diameter between 18 and 36 inches | $55
Diameter of 36 inches or more | $65
14A-6-607 | Signs | See Ch. 13-20
a. Skip stops must be included when determining number of stories.
b. Compressor capacity is based on the applicable Air-Conditioning and Refrigeration Institute published rating for the equipment involved.
(Amend Coun. J. 7-21-21, p. 33503, § 1)
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661999Fetched: 10/24/2026