Demand load.
Municipal Code of Chicago § 18-29-604.10.1.1
in effect18-29-604.10.1.1 Demand load.
The water supply demand load in the distributing system shall be based upon the number, type, and probable simultaneous use of the fixtures to be supplied.
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2691503Fetched: 10/24/2026
