Framing inspections.
Municipal Code of Chicago § 14A-5-502.3.3
in effect14A-5-502.3.3 Framing inspections.
Framing inspections must be requested after the roof deck or sheathing, framing, fire-blocking, and bracing are in place and pipes, chimneys, and vents to be concealed are complete and the rough electrical, plumbing, heating systems’ wires, pipes, and ducts have been inspected.
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661528Fetched: 10/24/2026
