For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-29-702.8.2 — Construction

Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 18-29-702.8.2

Corpus is an independent public-information project, not the official City of Chicago website. Stable reference URL

18-29-702.8.2 Construction.

Safe pans shall be constructed with preformed dam corners, shall be watertight, adequately reinforced and provided with a drain opening designed to make a watertight joint. PVC safe pans and liners shall be solvent welded together with the proper cement. (Added Coun. J. 10-14-21, p. 37722, Art. VII, § 2)

§ 18-29-702.8.2 — Construction | Chicago, IL — Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) | Corpus