For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14A-4-407.2.1.2 — Complex demolition

Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 14A-4-407.2.1.2

Corpus is an independent public-information project, not the official City of Chicago website. Stable reference URL

14A-4-407.2.1.2 Complex demolition.

A permit application for complex demolition must include: 1. A current survey marked with the horizontal distances between buildings or structures to be demolished, property lines, and buildings on the site that will not be demolished. 2. A report documenting the structural condition of the building or structure to be demolished and describing the methods to be used in the demolition or deconstruction. The report must be prepared, signed, and sealed by a registered design professional. 3. A written safety and operations plan, prepared by the demolition contractor or a registered design professional, describing how the project will comply with applicable requirements of Chapter 33 of the Chicago Building Code. (Added Coun. J. 6-25-21, p. 32180, Art. I, § 5; Amend Coun. J. 6-12-24, p. 13412, Art. II, § 6)

§ 14A-4-407.2.1.2 — Complex demolition | Chicago, IL — Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) | Corpus