§ 14A-5-502.6 — Plumbing inspections
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 14A-5-502.6
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference URL
14A-5-502.6 Plumbing inspections.
The permit holder must notify the building official when plumbing work done pursuant to a permit is ready for the following types of inspections: 1. Underground inspection, after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place. 2. Rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all sanitary, storm, and water distribution piping is roughed-in, and before the installation of wall or ceiling membranes. 3. Final inspection, after all plumbing fixtures are in place and properly connected and the work area is ready for occupancy. (Amend Coun. J. 2-19-20, p. 14473, Art. I, § 16)
