§ 2-05 — Application for Registration
New York City Administrative Code (current through L.L. 2026/147, enacted September 12, 2026, and amendments effective through October 10, 2026) · 15 RCNY § 2-05
Corpus is an independent public-information project, not the official City of New York website. Stable reference URL
§ 2-05 Application for Registration.
(a) Filing of application. (1) The application must be signed by the owner. The application must include all essential details pertaining to the equipment as set forth on the application form, and the manner in which new equipment will be installed. All documents must be certified by a professional engineer or registered architect. (2) Only one type and size of equipment may be included on any one application. For example, applications for a boiler and a furnace, which constitute similar equipment of different sizes, or applications for identical boilers with different (although equivalent) burners must be filed separately. (3) When filed, the application must include any supplementary data and calculation sheet(s), plans and any additional forms required by the department by rule. (b) Contents of application. The application must include the following: (1) The authorization of the equipment owner and his or her name, address and signature. The application must be signed by the proprietor where the business is a sole proprietorship. If the business is a partnership, the application must be signed by a partner. In the case of a corporation, the application must be signed by an officer of the corporation. In all instances, the signatory must indicate his or her title after his or her signature. (2) A licensed professional engineer or architect must certify the following: i. Venting calculations for stack/draft adequacy, which shall meet the same criteria as set forth in 15 RCNY § 2-04(b)(6). ii. Certificate of Compliance. All oil-fired boilers and associated burners, boiler/burner assemblies, and control equipment installed under this chapter must comply with the following equipment acceptance requirements so that such equipment meets the minimum design and performance standards of the department Equipment Acceptance Requirements (a) List of accepted equipment. If the application for the registration is to install equipment that appears on the list of accepted equipment, no additional certification is required. (b) UL/CSA/ETL listed equipment. If the application for the registration is to install equipment that is listed by UL, CSA Group, or ETL, a certification of compliance from a professional engineer must be submitted on a form prescribed by the department and available on the department's website. (c) Unlisted and custom equipment. If the application for the registration is to install custom equipment, or equipment that is not on the department's list of accepted equipment and is not UL, CSA Group, or ETL-listed, a certification of compliance from a professional engineer must be submitted on a form prescribed by the department and available on the department's website. (c) Boiler Room Plan. The plans, as specified below, must be filed with each application and must include the premise address of the installation. The plans must not be smaller than 8 1/2 by 11 inches nor larger than 11 by 17 inches and details must be shown legibly in black ink on a white background. (1) The boiler room layout must include the following: (i) boiler location. (ii) burner location (iii) breeching layout schematic, including the length, elbows, cross sectional dimensions; and location of "test holes." (iv) location and cross-sectional dimensions of the stack. Only the cross-sectional dimension of the outlet is required for existing stacks. (v) location of fixed ventilation. Ducts and other such pertinent details must be shown along with their dimensions. Length, elbows, cross-sectional dimensions and inlet and outlet locations must be included for any new ventilation ducts. (vi) location of smoke alarms, draft controls, fans, cleanouts, when applicable. These locations may be shown schematically. (vii) locations of all combustion equipment located in the same room or on the same stack and not covered by the subject application, including the manufacturer, model number, and fuel delivery rate when not shown on the application. The fixed ventilation supplied for all combustion equipment must be clearly shown on the plans, even if all such equipment is not covered by the subject application. (2) A licensed oil-burner installer must certify all oil burning installations and dual-fuel installations. A licensed oil-burner installer or a licensed plumber must certify all gas-fired installations. (Amended City Record 5/13/2016, eff. 6/12/2016)
