For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-628 — Erection

New York City Administrative Code (current through L.L. 2026/147, enacted September 12, 2026, and amendments effective through October 10, 2026) · NYC Admin. Code § 27-628

Corpus is an independent public-information project, not the official City of New York website. Stable reference URL

§ 27-628 Erection.

(a) Bracing. All framework shall be carried up true and plumb. Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which the framework was designed. (b) Temporary connections. As erection progresses, the work shall be securely bolted, or welded, to resist all dead loads, wind, and erection stresses. (c) Alignment. The structure shall be properly aligned before riveting, permanent bolting, or welding is performed.