For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

FGC 415 — Piping Support Intervals

New York City Administrative Code (current through L.L. 2026/147, enacted September 12, 2026, and amendments effective through October 10, 2026) · NYC Fuel Gas Code § FGC 415

Corpus is an independent public-information project, not the official City of New York website. Stable reference URL

Section FGC 415: Piping Support Intervals

415.1 Interval of support. Piping shall be supported at intervals not exceeding the spacing specified in Table 415.1. Table 415.1 Support of Piping Steel Pipe, Nominal Size of Pipe (inches) Spacing of Supports (feet) 1/2 6 3/4 or 1 8 1 1/4 or larger (horizontal) 12 All vertical piping Every floor level For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.