For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 48-05 — Project Feasibility Requirements

New York City Administrative Code (current through L.L. 2026/147, enacted September 12, 2026, and amendments effective through October 10, 2026) · 15 RCNY § 48-05

Corpus is an independent public-information project, not the official City of New York website. Stable reference URL

§ 48-05 Project Feasibility Requirements.

(a) The building for which the proposed Project will be implemented must be fully constructed and in a condition to accept the Retrofit at the time of application. (b) The proposed Project must manage stormwater runoff from the surrounding impervious tributary drainage area and be designed in accordance with the Program Guide. (c) Projects must be determined to be feasible by a structural analysis that has been performed by a professional structural engineer licensed by the State of New York and that concludes that the loading capacity of the roof is sufficient to support the proposed Project. (Added City Record 5/11/2017, eff. 6/10/2017; amended City Record 12/9/2019, eff. 1/8/2020)