Refrigeration inspections.
Municipal Code of Chicago § 14A-5-502.7
in effect14A-5-502.7 Refrigeration inspections.
The permit holder must notify the building official when mechanical refrigeration work done pursuant to a permit is ready for the following types of inspections:
1. Where portions of the mechanical refrigeration system will be concealed by construction: rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all distribution piping is roughed-in, and before the installation of wall or ceiling membranes.
2. Final inspection, upon completion of the mechanical refrigeration system.