Regulated equipment.
Municipal Code of Chicago § 14A-4-412.3.1
in effect14A-4-412.3.1 Regulated equipment.
If a permit is sought to install regulated equipment, the applicable stand-alone fee provided in Section 14A-4-412.1 must be assessed for each piece of equipment so installed, unless all of the following requirements are met:
1. A permit fee is charged in accordance with Section 14A-4-412.2.
2. The regulated equipment is clearly indicated on the construction documents submitted with the permit application.
3. Any application or form required by the Department of the Environment to install such regulated equipment is submitted with the permit application;
4. The Department of the Environment reviews and approves any required drawings or plans for the installation of the regulated equipment to be installed.
Where all of the requirements of this section are met, the permit fee assessed under Section 14A-4-412.1 or 14A-4-412.2 includes the fee that would otherwise apply to install such regulated equipment. If any requirement of this section is not met, a separate permit application must be submitted for installation of the regulated equipment.
(Amend Coun. J. 12-20-25, p. 39283, Art. III, § 7)