Sewer required.
Municipal Code of Chicago § 18-29-701.2
in effect18-29-701.2 Sewer required.
Every building in which plumbing fixtures are installed and every premises having drainage piping shall be connected to a public sewer, where available. When a public sewer is not available, drain pipes from buildings shall be connected to a drainage system for sewage disposal, as approved by the Commissioner of Water Management.
(Amend Coun. J. 7-29-15, p. 3537, § 4; Amend Coun. J. 10-14-21, p. 37722, Art. VII, § 1)
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2691889Fetched: 10/24/2026
