Construction inspections of stormwater management system.
El Paso City Code § 19.19.050
in effect19.19.050 - Construction inspections of stormwater management system.
A. Inspections to Ensure Plan Compliance During Construction. Periodic inspections of the stormwater management system construction shall be conducted by the city.
B. Final Inspection and Record Drawings and Documents. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit as constructed record drawings and documents for any stormwater management facilities after final construction is completed. The record drawings must include the final design specifications for all stormwater management facilities and must be certified by a professional engineer licensed in the State of Texas. For those facilities that included mechanical systems, operations and maintenance manuals shall also be included. A final inspection to be conducted concurrent with other inspections by the city is required before the release of any performance bonds can occur.
(Ord. 16882 § 2 (part), 2008)
Source: City of El Paso, City Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART2SUST_CH19.19STMARE_19.19.050COINSTMASYFetched: 10/28/2026
