Oklahoma City Municipal Code § 57-146 Existing facilities required to obtain permit.
§ 57-146. - Existing facilities required to obtain permit.
(a) Requirement. Any existing industrial, commercial, institutional, or multi-family or group residential facilities, which discharge stormwater into community waters or the MS4, will be required to develop and comply with Pollution Prevention Plans and apply for a Stormwater Discharge Permit before conducting any operations. This permit shall be required in addition to any permits required by EPA or the State.
(b) Plans. These plans will be submitted to the Manager of Stormwater Quality Management for review. After review, a permit will be issued within six months of the submittal date, which will incorporate any approved Pollution Prevention Plans into the permit. The permit may require the facility to implement structural and non-structural Best Management Practices (BMPs) to reduce pollution discharge. If the application is disapproved, the Manager shall notify the applicant of deficiencies and allow 90 days for the application to be revised and re-submitted. If the noted deficiencies are not corrected within 90 days and the application resubmitted for approval, or if after being submitted is disapproved, any discharge of stormwater after that date into waters of the community shall be unlawful.
(c) Application. The application for an Industrial Stormwater Discharge Permit for an existing facility shall include the following:
(1) a site map of facility showing buildings, parking, drives, materials loading and access areas, type of each impervious surface, ditches, pipes, catch basins, drainage basin limits, area of facility, acreage of off-site water draining onto facility, discharge points to "Waters of the State" or "Community Waters" with name of the water or drainage basin. This map will be a minimum of scale of 1″=100′;
(2) description of facility, nature of work performed, and type of facility;
(3) a narrative description of significant materials (as defined at 40 CFR § 122.26, November 16, 1990) that are currently or in the past have been treated, stored, or disposed outside; method of on-site storage or disposal; materials management practices used to minimize contact of these materials with stormwater runoff currently and for the past three years; materials loading and access area; the location and description of existing structural and non-structural control measures to reduce pollutants in stormwater runoff; and a description of any treatment the stormwater receives;
(4) cleanup schedule for debris, material storage areas, garbage storage or disposal areas, or other areas that have the potential to pollute stormwater;
(5) description of plan of instruction to employees of all levels in ways to prevent pollution and spill response. The plan shall identify periodic dates for such training;
(6) name of contact person for permit compliance, including job title, address, and phone number;
(7) maintenance schedule of sweeping or vacuuming of facility to prevent washout of a build-up of emissions laden with hydrocarbons, oxides, salts, metals, worn pavement particulates, hydrocarbons for leaks and spills, trash, debris, garbage, metals, tire particles, brake lining particles and various chemicals from the wear, deterioration, and deposition from vehicles;
(8) description of other ways the facility plans to implement programs to reduce the discharge of pollutants through stormwater flow. For each area of the facility that generates stormwater discharges associated with an activity with a reasonable potential for containing significant amounts of pollutants, a prediction of the direction of flow, and an estimate of the types of pollutants which are likely to be present in stormwater discharges associated with industrial activity;
(9) each application shall include plans showing the construction of an appropriately sized grit sediment basin and oil skimmer structure for discharge outfalls into "Community Waters" in accordance with detailed drawings of these structures which are shown in the Stormwater Management Section Best Management Practices Manual;
(10) each application shall include a record of available sampling data describing pollutants in stormwater discharges;
(11) each application shall include a preventive maintenance program that included regular inspection and maintenance of stormwater management devices (e.g. cleaning grit chambers, catch basins) as well as inspecting and testing plant equipment and systems to uncover conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters;
(12) each application shall designate a person to keep record of incidents such as significant spills of toxic pollutants or other discharges which materially affect the stormwater, along with other information describing the quality and quantity of stormwater discharges. Inspections and maintenance activities shall be documented and recorded.
(d) Permit duration.
(1) The permit shall be for a term of one year subject to the conditions set forth in this article and on the permit.
(2) Should the permittee need to extend the permit beyond its original one-year term, then prior to the expiration of the current permit term, the permittee must apply for renewal of the permit and must obtain a renewed permit. Permits may be renewed for an additional one-year term subject to the conditions set forth in this article and on the permit.
(3) Until the permitted activity is completed and the permit site meets City standards, permittee must maintain a current permit by
(A) complying with the terms of the permit and this article; and
(B) annually before the anniversary date of the issuance of the original permit, apply for and procure a renewal of the permit.
(4) Failure to timely renew a permit required hereunder will result in late fees.
(5) Permittee must pay all fees as a condition of completion of the permitted project, including:
(A) permit renewal; and
(B) late fees; and
(C) re-inspection fees.
(e) Enforcement.
(1) In addition, if permittee allows a permit to expire or fails to timely procure renewal of a permit, then the Director or designee may suspend any soil disturbing, industrial, or construction activities at the site by permittee and its successors, contractors, and agents; however such suspension will not relieve the permittee's obligations to maintain the site in a safe condition and in compliance with City ordinances.
(2) If the Director or designee determines that permittee has failed to comply with any conditions of the permit, then the Director or designee may suspend any soil disturbing, industrial, or construction activities at the site by permittee and its successors, contractors, and agents; however such suspension will not relieve the permittee's obligations to maintain the site in a safe condition and in compliance with City ordinances.
(Ord. No. 21321, § 1, 9-28-99; Ord. No. 22755, § 2, 7-5-05; Ord. No. 24076, § 3, 6-15-10)
