Calculation for revision.
Municipal Code of Chicago § 14A-4-412.2.2.4
in effect14A-4-412.2.2.4 Calculation for revision.
Where the scope of work is revision to a permit for which the permit fee was calculated in accordance with Section 14A-4-412.2.2.1 or 14A-4-412.2.2.2, the permit fee for the subsequent permit may be calculated in accordance with Section 14A-4-412.2.2.1 or 14A-4-412.2.2.2 or as follows as determined by the building official:
F sp = F op ÷ P op x P sp
where:
F sp = The fee to be charged for the subsequent permit
F op = The fee charged for the original permit
P op = The number of pages of construction documents marked "reviewed for code compliance" in connection with issuance of the original permit
P sp = The number of pages of construction documents marked "reviewed for code compliance" in connection with issuance of the subsequent permit
The permit fee for the subsequent permit calculated in accordance with this section is subject to the minimum fee which applies to the scope of work covered by the original permit in accordance with Tables 14A-12-1204.3(3) through 14A-12-1204.3(6).
(Added Coun. J. 10-7-20, p. 21791, Art. I, § 16)
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2661414Fetched: 10/24/2026
