Required Inspections for an Electrical Permit
San Diego Municipal Code § 129.0314
in effect§129.0314 Required Inspections for an Electrical Permit
All construction work and equipment authorized by an Electrical Permit shall be inspected by the Building Official in accordance with Section 129.0111. Inspections that may be required are established by the Building Official.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
(Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.)
(Amended 1-18-2018 by O-20897 N.S.; effective 2-17-2018.)
Source: City of San Diego Office of the City Clerk, San Diego Municipal Code and City Charter (docs.sandiego.gov PDFs)URL: https://docs.sandiego.gov/municode/MuniCodeChapter12/Ch12Art09Division03.pdf#page=6Fetched: 10/28/2026
