Clearances.
Municipal Code of Chicago § 18-29-708.9
in effect18-29-708.9 Clearances.
Cleanouts on 6-inch (150 mm) and smaller pipes shall be provided with a clearance of not less than 18 inches (457 mm) for rodding. Cleanouts on 8-inch (200 mm) and larger pipes shall be provided with a clearance of not less than 36 inches (914 mm) for rodding.
Source: City of Chicago, Municipal Code of Chicago (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/chicago/latest/chicago_il/0-0-0-2692151Fetched: 10/24/2026
