Engineering report.
Baltimore City Code, Article 7, § 3-26
in effect§ 3-26. Engineering report.
(a) Report required.
Any proposal to offset the effect of development in the Floodway by construction of stream modifications must be documented by an engineering report, prepared by a licensed professional engineer, that fully evaluates the effects of the construction and is submitted with the application for a building permit.
(b) Basis.
As the basis of analysis, the report must use the base flood and floodway data prepared by the Federal Emergency Management Agency.
(Ord. 14-208; Ord. 11-516; Ord. 88-188.)