For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 153.0401 — Grading Regulations

San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 153.0401

Corpus is an independent public-information project, not the official City of San Diego website. Stable reference URL

§153.0401 Grading Regulations

(a) The following criteria shall be incorporated by the City Manager, Planning Commission and City Council when implementing any proposed grading within the Carmel Valley Planned District: (1) Preparation of a comprehensive landscaping and irrigation plan for all graded slopes to provide for rapid stabilization of slope areas; (2) Close phasing of grading operations and slope landscaping and building construction to reduce the period when bare slopes are susceptible to erosion; (3) Design project to preserve natural topography, unique geologic formations, and native vegetation to the fullest extent possible; (4) Use contour grading techniques to reduce harsh, manufactured slopes, utilizing rounded top and toe of slopes which blend into natural contours wherever possible; (5) Minimize the height of cut-and-fill slopes wherever possible, while varying the gradient of long, horizontal banks; (6) Utilize slopes' gradients that can readily support landscaping; (7) Construct permanent energy dissipators and settling/catchment basins with regular, long-term maintenance; and (8) Provide a system of bladed ditches at flat gradients across larger, graded pad areas to allow on-site entrapment of silt during construction. (b) Approval of the first tentative map which shall propose any grading, a development, building or construction for each precise plan, shall be subject to the approval of a comprehensive drainage plan by the City Engineer for the entire area of the precise plan prior to recordation of a final map. This plan shall show drainage facilities, both permanent and temporary, which will be installed to control or mitigate soil erosion, silting of lower slopes, slide damage, or flooding problems. Such drainage provisions shall recognize the sensitivity and proximity of the Penasquitos Lagoon. (c) Post Development. The following guidelines shall be used when evaluating grading and excavation proposed after the initial development has been completed: (1) The development shall result in minimum disturbance of the natural terrain and vegetation commensurate with the proposed use of the lot or premises; and (2) Provisions are included to control or mitigate soil erosion, silting of lower slopes, slide damage, flooding problems, or excessive cutting or scarring.

(“Grading Regulations” added 3-27-2007 by O-19590 N.S.; effective 4-26-2007.)