§ 62.1112 — Quality Control
San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 62.1112
Corpus is an independent public-information project, not the official City of San Diego website. Stable reference URL
§62.1112 Quality Control
(a) All persons performing work in the public right-of-way are solely responsible for ensuring that the work performed, whether by that person, contractors, subcontractors, employees, agents or representatives, complies with all applicable City and State standards. (b) At the beginning of each calendar year, each public utility with facilities in the public right-of-way shall submit a quality control plan and emergency closure plan to the City Engineer for approval. (1) The quality control plan shall indicate the number of inspectors and the areas to which they are assigned. (2) Each emergency closure plan shall indicate steps to be taken during a flood or earthquake to address safety issues. (3) An emergency closure plan shall be filed with the City Engineer and with the City Emergency Operations Center.
(“Quality Control” added 5–28–1996 by O–18309 N.S.) (Amended 1-2-2013 by O-20231 N.S.; effective 2-1-2013.) (“Quality Control” renumbered from Section 62.1114 to Section 62.1112 and amended 8-8-2023 by O-21701 N.S.; effective 1-1-2024.)
