§ 536-823 — Electrical power for on-site construction

Revised Code of the Consolidated City and County of Indianapolis-Marion County (Supp. No. 47, Update 2: codified through Ordinance No. 42, 2026, passed June 1, 2026) · Indianapolis-Marion County Revised Code § 536-823

Corpus is an independent public-information project, not the official City of Indianapolis website. Stable reference URL

Sec. 536-823. - Electrical power for on-site construction.

(a) No person, partnership or corporation shall accomplish or allow the connection, provision or use of electrical power for on-site construction until after a statement of acceptable condition for temporary on-site electrical power has been attached to the temporary service equipment. Such statement shall be in the following form: STATEMENT OF ACCEPTABLE CONDITIONS FOR TEMPORARY ON-SITE ELECTRICAL POWER Address of temporary service equipment: _____ _____ The undersigned licensee hereby certifies under the penalties for perjury that: 1. I am an electrical contractor licensed in accordance with Chapter 875 of the Revised Code of Indianapolis-Marion County, Indiana; and 2. I have either personally accomplished or personally inspected all the above referenced electrical work accomplished in connection with the installation of the temporary service equipment, or in the alternative, I have caused such electrical work to be inspected by a responsible and competent employee who works under my direction and control, who has fully reported to me the condition of such electrical work; and 3. I am familiar with building standards and procedures applicable to electrical work accomplished in connection with the installation of temporary service equipment; and 4. I know that such electrical work has been done in compliance with all building standards and procedures; and 5. I acknowledge and understand that if such electrical work is done in violation of building standards and procedures, that under the provisions of Chapter 875 my electrical contractor's license may be suspended or revoked. Date certificate attached to service equipment: _____ _____ Signature Electrical contractor license number: _____ _____ Type or printed name (b) The provision and use of electrical power for on-site construction shall be subject to reasonable orders made by the administrator as assigned by the deputy director of the division of construction and business services or his or her authorized representative pertaining to such matters as magnitude, duration and method of furnishing and distributing electrical power.

(Code 1975, § 8-132; G.O. 1, 2002, § 1; G.O. 9, 2005, § 16; G.O. 63, 2009, § 32; G.O. 41, 2016, § 2)