FGC 631 — Boilers
New York City Administrative Code (current through L.L. 2026/147, enacted September 12, 2026, and amendments effective through October 10, 2026) · NYC Fuel Gas Code § FGC 631
Corpus is an independent public-information project, not the official City of New York website. Stable reference URL
Section FGC 631: Boilers
631.1 Standards. Boilers shall be listed in accordance with the requirements of ANSI Z21.13/CSA 4.9 or UL 795. If applicable, the boiler shall be designed and constructed in accordance with the requirements of ASME CSD-1 and as applicable, the ASME Boiler and Pressure Vessel Code, Sections I, II, IV, V, VI and IX and NFPA 85. Low pressure boilers shall conform to the requirements of 12 NYCRR Part 4 and high pressure boilers shall conform to the requirements of 12 NYCRR Part 14. 631.2 Installation. In addition to the requirements of this code, the installation of boilers shall be in accordance with the manufacturer's instructions and the New York City Mechanical Code. Operating instructions of a permanent type shall be attached to the boiler. Spill switches must be installed on all flue gas draft openings and interlocked with all vented appliances. Boilers shall have all controls set, adjusted and tested by the installer. A complete control diagram together with complete boiler operating instructions shall be furnished by the installer. The manufacturer's rating data and the nameplate shall be attached to the boiler. 631.3 Clearance to combustible materials. Clearances to combustible materials shall be in accordance with Section 308.4.
