For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1163.025 — Electricity metering systems

Columbus City Codes; partial (Supp. No. 86: codified through Ordinance No. 2063-2026, enacted July 2, 2026) · Columbus City Codes § 1163.025

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference URL

1163.025 - Electricity metering systems.

A. The Director of Columbus Water & Power is hereby authorized to install, read and maintain metering systems to any and all properties served with electricity by the Division of Power. No person acting under the direction or authorization of the Director of Columbus Water & Power shall be required to obtain a certificate of appropriateness or approval under Title 31, Title 33, or Title 34 for the installation, maintenance, or replacement of such metering systems. B. The Director of Columbus Water & Power or the director's appointed agents are authorized to enter all properties served with electricity by the Division of Power for the purpose of installing, reading and maintaining the metering system. C. Electricity service may be terminated for failure of a customer to provide access to the property for the purpose of installing, reading or maintaining the metering systems pursuant to the provisions of City Code Section 1160.03. D. The property owner shall pay the appropriate service termination and resumption charges as specified in Section 1163.19 for denying access to the Director of Columbus Water & Power or the director's agents for the purpose of installing, reading and maintaining the metering system. E. The customer is responsible for damage to the metering system resulting from negligence or vandalism and shall be charged for said damages to the meter according to Section 1163.19, except that said charge shall not be imposed when to the satisfaction of the director it is shown that the damage is the result of conditions beyond the control of the customer. F. If the customer causes the obstruction of the metering system after its installation, or requests that the metering system be relocated, and the Division of Power agrees to perform such relocation, the customer shall be responsible for the relocation trip charge as specified in Section 1163.19, plus the actual costs of relocating any part of the metering system. The customer shall be responsible for removing or relocating equipment not owned by the Division of Power. G. The Director of Columbus Water & Power will determine the type of metering system to be installed for each customer and that if in the director's opinion an existing system is inadequate to meet the intent of Section 1163.025, the director shall cause it to be replaced with a system meeting said intent.

(Ord. No. 0139-2011, § 3, 3-7-2011; Ord. No. 2398-2012, § 14, 12-3-2012; Ord. No. 3314-2025, § 1(Exh. A), 12-15-2025; Ord. No. 1882-2026, § 1, 6-29-2026)